Product introduction
YZ Ladle Hook Casting Overhead Crane mainly consists of bridge, trolley, hook beam, crane travelling and electric part, etc.
Adopt double-girder structure below 125t and four-girder structure above 125t, the main grabbing device of main hook is fixed-spacing hook girder used to lift foundry ladle; auxiliary hook is used to work with main hook to dump the molten iron and do other subsidiary lifting operation; main hoisting and transportation equipment in steel mill and smelter workshop. Used for transshipment and pouring of liquid mill.
- Mainly used at the metallurgy and foundry place where the melten metal is lifted.
- Working class of complete machine is A7.
- Thermal-protective coating is added at the bottom of main girder.
- The assembling & test of the crane confirm to the document No.ZJBT[2007]375 which was issued by General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China.
- The place where molten nonmetal material and red-hot solid metal is lifted also can refer to this document.
Features
- The crane is heat resistance type. It has fire prevention heat insulation protection devices.
- The trolley is equipped with special motor for metallurgy insulation class H.
- The trolley is matched with two sets brakes/double brake, double drive mechanism.
- Hard-toothed surface driven for reducer's gear.
- The electric is fully covered, dustproof, and heat insulation for cooling.
- The cabin's window use double-layer toughened glass, equipped with industrial air cooler.
Technical Detail
![Lifting Trolley With Safety Brake](/wp-content/uploads/2017/12/Lifting-Trolley-With-Safety-Brake.jpg?w=248)
Lifting Trolley With Safety Brake
ription
![Double spout gantry automatic welding machine 副本](/wp-content/uploads/2017/12/Double-spout-gantry-automatic-welding-machine-副本.jpg?w=248)
Overhead Crane
ription
![Cable Line Storage](/wp-content/uploads/2017/12/Cable-Line-Storage1.jpg?w=248)
Cable Line Storage
ription
![Main Beam Processing](/wp-content/uploads/2017/12/Main-Beam-Processing1.jpg?w=248)
Main Beam Processing
ription
![Rope Drum Processing](/wp-content/uploads/2017/12/Rope-Drum-Processing.jpg?w=248)
Rope Drum Processing
ription
![Cabin Room](/wp-content/uploads/2017/12/Cabin-Room1.jpg?w=248)
Cabin Room
ription
![Four Girders for YZ Metallurgy Crane](/wp-content/uploads/2017/12/Four-Girders-for-YZ-Metallurgy-Crane.jpg?w=248)
Four Girders for YZ Metallurgy Crane
ription
![Electric Assembly Area 副本](/wp-content/uploads/2017/12/Electric-Assembly-Area-副本1.jpg?w=248)
Electric Assembly Area
ription